
Developers
FarHeater Engineering provides sealed mechanical, electrical, plumbing and sprinkler design for developers and building owners across Ontario — permit drawings, Site Plan Approval submissions, photometric plans and construction administration, delivered to the approval timeline the project is actually working to.
Most developers do not go looking for an engineering firm. They go looking for a drawing an authority will accept, on a date that protects the rest of the schedule. That is the problem this page is about: which approvals we prepare, how we keep a submission from coming back, and what we will tell you about the timeline before you commit to it.
Permit and Site Plan drawings, sealed
Complete mechanical, electrical and sprinkler sets prepared for building permit submission and sealed by a licensed Professional Engineer, with responses to examiner comments carried through to approval.
Photometric plans for Site Plan Approval
Site Plan Approval regularly requires a photometric plan showing light levels and spill at the property line. It is a distinct deliverable from the electrical drawings and it holds up approvals when nobody has owned it.
One firm for the whole MEP scope
HVAC, plumbing and drainage, sprinkler and hydraulic calculations, power, lighting and fire alarm are coordinated inside one office rather than across three consultants with three schedules.
Scale from a fit-up to a seven-storey structure
Recent work ranges from a 1,500 ft² retail fit-up to a 442-space parking structure with EV infrastructure, and from tenant improvements to full-building base systems.

What actually delays a permit
In our experience the drawings themselves are rarely the problem. Submissions come back because something sat outside everyone's scope — a photometric plan nobody produced, a hydraulic calculation that was never reconciled against the available water supply, a fire alarm sequence that was not coordinated with elevator recall or air handling shutdown, or a change on the architectural set that never reached the mechanical consultant. Every one of those is a coordination failure rather than an engineering one, which is why we establish the governing code path, the hazard classification and the full list of required submissions at the start, rather than discovering them at review.
How long MEP design takes
The honest answer is that it depends on the occupancy, the completeness of the architectural set and the authority having jurisdiction, and any firm that quotes a duration without seeing those is guessing. What we will do is give you a schedule once we have the drawings, tell you which items sit on the critical path, and say plainly when a date is not achievable rather than agreeing to it and missing it. Where a building is being staged, we can prioritise the submissions that unlock the next phase instead of delivering the full set at once.
Through construction, not just to permit
A sealed drawing is not the end of the engineer's involvement. We provide construction administration — shop drawing review, site reviews during installation, responses to contractor RFIs and commissioning support — so that what gets built matches what was approved. For owners this is the part that protects the asset: systems that were designed correctly and then installed to something else are a problem that surfaces years later, usually as an operating cost.
Building types we work in most
Multi-unit and high-rise residential, commercial fit-ups and base buildings, hospitality, parking structures and EV charging infrastructure, industrial and warehouse, restaurant and retail, and healthcare and laboratory environments with controlled spaces. The sector matters because it determines the code path and the specialist requirements — a commercial kitchen, a biosafety cabinet, a parking garage CO and NO₂ control strategy and a residential corridor pressurisation scheme are not interchangeable problems.
What we most often deliver for developers
Talk to an engineer
Tell us about the building, the scope and your timeline. An engineer will come back to you with next steps, usually within one business day.
Mon-Fri: 8:30 AM - 5:00 PM
Developers — frequently asked
- Can you produce drawings for building permit submission?
- Yes. We prepare complete mechanical, electrical and sprinkler drawing sets sealed by a licensed Professional Engineer for building permit submission, and we respond to the authority's comments through to approval.
- Do you provide photometric plans for Site Plan Approval?
- Yes. Photometric plans are a routine Site Plan Approval requirement and a distinct deliverable from the electrical drawings. We produce the calculations and the plan, covering parking areas, drive aisles, walkways and light trespass at the property line.
- How long does MEP design take?
- It depends on the building type, the completeness of the architectural drawings and the authority having jurisdiction. We give you a schedule once we have seen the set, identify what sits on the critical path, and tell you if a target date is not realistic rather than agreeing to it.
- Can you take on a project that another consultant started?
- Yes. We review what exists, identify what can be carried forward and what has to be reworked, and are clear about which parts we can take professional responsibility for. We will tell you honestly if restarting a portion is faster than correcting it.
- Do you work outside the Greater Toronto Area?
- Yes. Our head office is in Markham and we work across Ontario and nationally in Canada, with a United States office in Las Vegas, Nevada.
Sectors we have delivered in
Who else we work with
Ready to engineer your next project?
Tell us about your building. We'll show you the most efficient, compliant and cost-effective path from concept to completion.




