Skip to content
FarHeater Engineering Inc.
For Architects & Design Teams

Architects

FarHeater Engineering works as the mechanical and electrical consultant on architect-led projects across Ontario, modelling in REVIT alongside the architectural set, running clash detection before issue, and taking professional responsibility for the MEP scope so the coordinated drawing package holds together at review.

We are not competing for your scope. On an architect-led project the MEP consultant has one job: make the drawing set work, in the model you are already using, without becoming something you have to manage. This page is about how we slot into a design team and what we take off your plate.

We model in your environment

REVIT/BIM modelling of mechanical, electrical, plumbing and fire protection systems, federated with the architectural and structural models rather than drafted separately and reconciled later.

Clash detection before issue

Services are coordinated against structure and ceiling space in the model, so conflicts are resolved at the desk instead of surfacing on site as a change order.

2D sets are not a blocker

Where the architectural work is in 2D, we build the MEP model from the drawings. The coordination benefit still holds even when the wider team is not modelling.

One consultant across the MEP scope

Mechanical, electrical, sprinkler and fire alarm sit in one office, so the interfaces between them — alarm to elevator recall, alarm to air handling shutdown, sprinkler to available supply — are resolved internally before they reach you.

FarHeater Engineering — MEP consulting for architects

How we work inside a design team

We take the architectural model or set as the reference, work to your issue dates rather than our own, and raise coordination items as they arise instead of saving them for a submission. Where a design decision has an MEP consequence that would be expensive or awkward later — a ceiling void that will not take the duct run, a service room that cannot be ventilated the way the plan assumes, a riser that lands somewhere unworkable — we would rather tell you early and be wrong occasionally than stay quiet and be right too late.

Coordination issues that delay Ontario permits

The items that most commonly hold up a commercial building permit in Ontario are predictable and almost all of them live at the boundary between disciplines: fire alarm sequences that have not been written against elevator and HVAC interfaces, sprinkler hazard classification settled too late, hydraulic calculations never checked against the actual water supply, photometric plans missing from a Site Plan Approval package, and mechanical drawings that reflect a superseded architectural layout. We maintain a checklist of these and work through it before issue.

Taking professional responsibility for the MEP scope

Drawings are sealed by a licensed Professional Engineer, and we carry the design through examiner comments to approval. For your client that means the mechanical and electrical portion of the submission has a named professional standing behind it. For you it means the review correspondence on those disciplines comes to us.

Specialist environments

Some spaces carry requirements that a general MEP approach will not satisfy: healthcare and laboratory environments with pressure relationships and containment, commercial kitchens designed to NFPA 96 with wet chemical suppression, parking structures with contaminant control, and data or electrical rooms where a clean agent system is more appropriate than sprinkler protection. If your project includes one of these, it is worth raising at concept rather than at tender.

Services

What we most often deliver for architects

Get a Quote

Talk to an engineer

Tell us about the building, the scope and your timeline. An engineer will come back to you with next steps, usually within one business day.

Mon-Fri: 8:30 AM - 5:00 PM

We typically respond within one business day.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Common Questions

Architects — frequently asked

Do you work in REVIT alongside our model?
Yes. We model the mechanical, electrical, plumbing and fire protection systems in REVIT and federate with the architectural and structural models so coordination happens in the model rather than on paper.
Can you model MEP for a building that has no existing model?
Yes. Where the architect is working in 2D we build the MEP model from the drawings, which still delivers the coordination benefit even though the wider team is not modelling.
Will you work to our issue dates?
Yes. On an architect-led project we work to the design team's programme. We will tell you early if a date is not achievable for the MEP scope rather than committing and missing it.
Do you seal the mechanical and electrical drawings?
Yes. Drawings are sealed by a licensed Professional Engineer and we carry the MEP scope through the authority's comments to approval.
Do you take on consulting work for other firms?
Yes. A significant share of our work comes through architectural practices and multidisciplinary firms engaging us for the mechanical and electrical scope.
Proof

Sectors we have delivered in

Ready to engineer your next project?

Tell us about your building. We'll show you the most efficient, compliant and cost-effective path from concept to completion.