REVIT/BIM Modeling
BIM (Building Information Modelling) produces a coordinated 3D model of a building's architectural, structural, and MEP systems so conflicts are found and resolved before construction begins. FarHeater Engineering builds these models in Autodesk REVIT.
BIM (Building Information Modelling) produces a coordinated 3D model of a building's architectural, structural, and MEP systems so conflicts are found and resolved before construction begins. FarHeater Engineering builds these models in Autodesk REVIT.
We utilize Building Information Modeling (BIM) to deliver detailed, accurate, and collaborative designs. Using REVIT, we create comprehensive 3D models that integrate architectural, structural, and mechanical systems. These models allow us to identify and resolve potential conflicts before construction begins, saving time and reducing costs. During construction, BIM models serve as a reliable reference to ensure all components are installed correctly and in compliance with the design.

Working to a defined Level of Development
BIM goes wrong most often because nobody agreed what the model was for. Level of Development describes how much a given element can be relied upon at a given stage: an early model may show a duct route indicatively, while a coordination model carries real sizes, clearances and connection points, and a fabrication-level model supports shop drawings. Agreeing the LOD for each discipline at each stage, usually through a BIM Execution Plan, is what makes the model trustworthy. We set that expectation before modelling begins rather than discovering the mismatch during coordination.
Clash detection and the federated model
The value of MEP modelling comes from combining the architectural, structural and services models into a single federated model and running clash detection against it. Hard clashes, where a duct occupies the same space as a beam, are the obvious output; the more useful findings are the soft ones — insufficient clearance to service a valve, no access route to a damper, a ceiling void that cannot physically accommodate everything routed through it. Each of those found in the model is a change that never becomes an RFI, a delay or a change order on site.
Collaborating with the wider design team
We work within the architect's model where one exists, adopting shared coordinates and the established file exchange so that the services model sits correctly against the building. Where no model exists, we can build the MEP model from drawings. Either way the practical requirements are the same: an agreed exchange cadence, consistent coordinates, defined naming, and clarity about who owns which elements. These sound administrative but they are what determine whether coordination actually works.
What the model is worth on site
A well-coordinated model reduces requests for information, reduces change orders arising from clashes, and gives the contractor a reliable basis for prefabrication, which shortens the programme. It also carries forward: the model becomes a record of what was installed and can carry asset data into facilities management. For a client, the return on BIM is almost entirely a function of how rigorously coordination was done before construction began.
Get a quote for REVIT/BIM Modeling
Tell us about the building, the scope and your timeline. An engineer will come back to you with next steps, usually within one business day.
Mon-Fri: 8:30 AM - 5:00 PM
REVIT/BIM Modeling — frequently asked
- What is clash detection in BIM?
- Clash detection finds places where ductwork, piping, conduit, and structure would physically collide, so the conflict is solved on screen instead of discovered in the field at far greater cost.
- Can you work from an architect's existing REVIT model?
- Yes. We routinely link to the architectural and structural models and develop the mechanical and electrical systems inside that coordinated environment.
- Does BIM benefit construction as well as design?
- Yes. The model becomes a reference during installation, confirming components go in as designed and giving the contractor accurate coordination information.
- What is a BIM Execution Plan?
- A document agreed at the start of a project setting out what the model is for, the Level of Development expected from each discipline at each stage, file exchange arrangements and coordinates, and who is responsible for what. It is the single most effective way to prevent BIM coordination from breaking down.
- What is the difference between a hard clash and a soft clash?
- A hard clash is two elements occupying the same space, such as a duct through a beam. A soft clash is a clearance or access problem — a valve that cannot be reached, or a ceiling void too shallow for everything routed through it. Soft clashes cause more trouble on site because they are easier to miss.
- Can you model MEP for a building that has no existing model?
- Yes. Where the architect is working in 2D we can build the MEP model from the drawings, which still delivers the coordination benefit even though the wider team is not modelling.
- Does BIM add cost to a project?
- It moves cost earlier. More effort goes into design coordination, and less into resolving clashes on site through RFIs, rework and change orders. On coordinated projects the net effect is normally a saving, and a more predictable programme.